Skud Technical Case Study Corporate Office TAB Kuala Lumpur Malaysia
Case study · Commercial

A new office balanced to design, before day one.

NEBB-certified Testing, Adjusting & Balancing for a new corporate office in Kuala Lumpur, Malaysia. A finished high-rise tenancy brought to design airflow and comfort before the team moved in.

Commercial · Corporate office Kuala Lumpur, Malaysia TAB NEBB-certified
Project snapshotSKUD
SectorCommercial, corporate office fit-out
FacilityHigh-rise office tenancy
LocationKuala Lumpur, Malaysia
ScopeFull post-fit-out tenancy
ServiceTesting, Adjusting & Balancing
StandardNEBB-certified TAB methodology
OutcomeBalanced and operational on schedule
Scope at a glance

A whole-office balance, across every air system.

Zone by zone
Every zone measured against its own design, not a floor average
Post fit-out
Balanced around finished interiors, without disturbing them
On schedule
Comfortable and operational on move-in day
Independent
Skud did not install, supply, or commission any of it
The brief

A finished fit-out that had to perform on move-in.

A new corporate office occupied a high-rise tenancy made up of multiple HVAC zones, each with its own configuration and airflow requirements. The interior fit-out was complete and the team was due to move in, so the air systems had to be balanced to design and the space brought to comfort on a tight timeline, without disturbing finished interiors or disrupting handover.

The challenge

Balancing at scale, over a live, finished floorplate.

  • Precise airflow distribution to every supply grille, each measured against its own design value rather than sampled across the zone.
  • Consistent performance from every air handling unit, terminal unit, and variable air volume box running together, not one at a time.
  • Working around completed interior finishes, with minimal disruption to post-fit-out activity and nothing left marked or opened.
Our approach

NEBB-certified TAB, zone by zone.

Skud applied its NEBB-certified TAB methodology across the whole tenancy, working to documented procedures so every reading was traceable and defensible.

  • Initial airflow assessment and diagnostic measurement across each zone.
  • Systematic adjustment of the air handling units, terminal units, variable air volume boxes and grilles to their design values.
  • Continuous monitoring and re-testing until every system met its target.
  • Independent readings throughout. Skud did not install, supply, or commission any of what it measured.
The outcome

Every zone balanced, comfortable, and ready on schedule.

Every air system was balanced to design specification, with airflow and temperature brought to target across the whole tenancy. The work was completed within the client's tight timeline and with minimal disruption to the finished fit-out, so the office was comfortable and immediately operational on move-in, with an independent, documented record of HVAC performance behind it.

Worked to ▸ NEBB Procedural Standard for TAB ▸ ASHRAE-based practices ▸ Project design intent and sequence of operations