Full NEBB-certified Testing, Adjusting & Balancing across a data centre and office campus in Thailand. Everything appeared to be working. The measurements said otherwise.
A data centre and office campus in Thailand needed its full air and water scope balanced and documented, across every air handling unit, terminal unit, fan, grille and diffuser on the air side, and every pump and balancing valve on the water side.
The two halves of the campus want different things. Data halls want tight, stable, continuous conditions. Offices want comfort across occupied hours. Both draw on the same central plant, so the balance has to satisfy two sets of criteria from one system.
Skud ran its NEBB-certified TAB methodology across the campus, mobilising as many times as the plant’s readiness required, and working nights to keep the programme moving.
One more pump was running than the design duty required. The campus was cooling perfectly well, every space was comfortable, no alarm was raised, and nothing on any screen suggested a problem. That pump was doing no work the design called for, and it would have gone on doing no work for the life of the building.
It was identified against the design duty, reported, and corrected. That is the entire case for measuring a building rather than observing it. A system that is over-served looks healthier than a system that is correct: everything is cool, nothing complains, and the excess simply arrives on the electricity bill every month, forever, with nothing to attribute it to. Nobody finds that by walking the plant room. It only shows up when someone independent puts a reading against the design.
The full air and water scope was balanced to NEBB tolerances and the campus was handed over with a NEBB-format certified TAB report.