Skud Technical Case Study Data Centre TAB Thailand
Case study · Data centre

A pump was running that nobody needed.

Full NEBB-certified Testing, Adjusting & Balancing across a data centre and office campus in Thailand. Everything appeared to be working. The measurements said otherwise.

Data centre Thailand TAB NEBB-certified
Project snapshotSKUD
SectorData centre and office
LocationThailand
ScopeAir side and water side, full campus
ServiceTesting, Adjusting & Balancing
ProgrammeMultiple mobilisations, night working
OutcomeRedundant pump identified and corrected
Scope at a glance

Everything was working. That was the problem.

Air + water
Full campus scope, both sides, one balance
±10%
NEBB acceptance tolerance held across every system
Design duty
Every reading taken against design, not against appearances
Corrected
Redundant pump identified, reported, and shut down
The brief

A campus that had to serve two very different buildings at once.

A data centre and office campus in Thailand needed its full air and water scope balanced and documented, across every air handling unit, terminal unit, fan, grille and diffuser on the air side, and every pump and balancing valve on the water side.

The two halves of the campus want different things. Data halls want tight, stable, continuous conditions. Offices want comfort across occupied hours. Both draw on the same central plant, so the balance has to satisfy two sets of criteria from one system.

The challenge

The water side could not start at all.

  • A leaking gate valve meant the water side could not be brought to a stable, isolated condition. Until that was made good, water balancing could not begin at all.
  • That turned one mobilisation into several. The programme was worked around the plant’s readiness rather than the other way round, with equipment failures interrupting the sequence along the way.
  • Night working, because a live campus does not stop to be measured.
  • Scale, across two building types drawing on one central plant, with every terminal point measured individually rather than sampled.
Our approach

Measure against design, not against appearances.

Skud ran its NEBB-certified TAB methodology across the campus, mobilising as many times as the plant’s readiness required, and working nights to keep the programme moving.

  • Air-side performance testing and balancing across every air handling and terminal unit, and down to every grille and diffuser they served.
  • Water-side performance testing and flow verification across every pump and balancing valve, once the water side could be held stable.
  • Every reading taken against the design duty rather than against what the plant appeared to be doing.
  • Independent readings throughout. Skud did not install, supply, or commission any of what it measured.
The outcome

A pump that nobody needed, running around the clock.

One more pump was running than the design duty required. The campus was cooling perfectly well, every space was comfortable, no alarm was raised, and nothing on any screen suggested a problem. That pump was doing no work the design called for, and it would have gone on doing no work for the life of the building.

It was identified against the design duty, reported, and corrected. That is the entire case for measuring a building rather than observing it. A system that is over-served looks healthier than a system that is correct: everything is cool, nothing complains, and the excess simply arrives on the electricity bill every month, forever, with nothing to attribute it to. Nobody finds that by walking the plant room. It only shows up when someone independent puts a reading against the design.

The full air and water scope was balanced to NEBB tolerances and the campus was handed over with a NEBB-format certified TAB report.

Worked to ▸ NEBB Procedural Standard for TAB ▸ ASHRAE 111
Have a project like this?

Independent, NEBB-certified TAB for complex and mission-critical projects.