A hospital in Selangor, Malaysia, balanced end to end under NEBB-certified TAB, with its positive and negative isolation rooms certified separately to the NEBB cleanroom procedural standard.
A hospital ward block needed its full HVAC scope balanced. Inside it, the isolation rooms needed something more than a balance. They needed certifying.
Isolation rooms run in two directions, and the tower had both. A positive room holds pressure outward, keeping the building out to protect a patient whose immune system cannot defend itself. A negative room holds pressure inward, keeping the room in to protect everyone else from what is inside it. Same corridor, same air handling plant, opposite requirements. Point one the wrong way and it does the reverse of its job, silently, with nothing visible to anyone in the building.
Skud holds NEBB certification in Testing, Adjusting & Balancing and in Cleanroom Performance Testing, so the building and the isolation rooms were proven under one mobilisation, by one accountable party, working to documented procedures throughout.
The building was balanced to NEBB tolerances across its full air scope and documented throughout. Every isolation room was certified to the NEBB cleanroom procedural standard, each proven against the direction it was designed to hold rather than assumed correct because the floor around it balanced.
Both were handed over as NEBB-format certified reports from a single independent party: one record covering the building the isolation rooms sit in, and the isolation rooms themselves, with no gap between the two for a question to fall into.