What is testing and commissioning (T&C)?
What T&C means on a building project, the five levels of testing, what goes into the report, and who should carry it out.
- Testing and commissioning (T&C) proves installed building systems perform to design before handover.
- Testing is measuring. Commissioning is bringing a system into service and documenting that it is ready.
- Larger projects and data centres run T&C in five levels, from factory tests to integrated systems testing.
- Testing, Adjusting & Balancing supplies the measured airflow and water flow data that T&C relies on.
Testing and commissioning, usually shortened to T&C, is the process that proves a building’s systems work as designed before the owner accepts them. Equipment is checked, started, tested under load and adjusted, and every result is recorded against the design. T&C is what turns an installed system into an accepted one.
On a construction project, T&C sits between installation and handover. The contractor can say a chiller is installed and running. T&C shows, with measured data, that it delivers the cooling, airflow and control response the design called for.
What testing and commissioning means
The two words describe two different jobs.
- Testing is measuring. Airflow, water flow, pressure, temperature, power, noise and control signals are measured with calibrated instruments and compared with the design values.
- Commissioning is the wider process of bringing a system into service: confirming it is installed correctly, starting it safely, proving it performs and documenting that it is ready for handover.
Together, T&C answers one question the owner, consultant and authority all care about: does this system do what it was designed to do, and can you prove it?
What T&C covers on an ACMV system
For air-conditioning and mechanical ventilation (ACMV), T&C typically covers:
- Chilled water plant: chillers, cooling towers, pumps and the flow through each coil.
- Air side: air handling units, fan coil units, VAV boxes, fans and the airflow at every diffuser and grille.
- Ductwork: duct air leakage testing (DALT) before ceilings close.
- Controls: sensors, valves, dampers and the building management system (BMS) sequences that run the plant.
- Ventilation and pressurisation: fresh air rates, exhaust, and room or stairwell pressure where the design requires it.
The measured part of this work, setting and proving airflow and water flow, is Testing, Adjusting & Balancing. Without it, a plant can start and run but still leave half the building too warm.
Testing and commissioning in Malay
In Malay, testing and commissioning is pengujian dan pentauliahan. It is the term you will see in Malay-language specifications and many government project documents. It means exactly the same process: test the installed system, prove it performs, and document it for handover.
The five levels of testing and commissioning
On larger projects, and on almost every data centre, T&C is organised into five levels. Each level must pass before the next one starts.
- Level 1: Factory witness testing. Major equipment such as chillers, AHUs and generators is tested at the manufacturer’s factory before it ships.
- Level 2: Installation checks. Each item is inspected on site against the drawings and the manufacturer’s requirements before it is energised. Ductwork leakage testing and pipe pressure testing happen here.
- Level 3: Start-up and pre-functional checks. Equipment is started for the first time, rotation and safeties are checked, and initial readings are taken.
- Level 4: Functional performance testing. Each system is run through its operating modes and proven against the design. Testing, Adjusting & Balancing is completed at this stage, so the airflow and water flow figures are final.
- Level 5: Integrated systems testing (IST). All systems are tested together under realistic conditions, including failure scenarios such as loss of mains power, to prove the building responds as one.
Smaller commercial projects often combine levels 2 to 4. The principle stays the same: nothing is accepted until it has been measured and documented.
Who carries out testing and commissioning?
On most projects, the installing contractor runs the T&C and the consultant witnesses the key tests. That works, but it leaves the contractor checking their own work, often under programme pressure at the end of the job.
More owners and consultants now appoint an independent third party to verify the results. An independent firm has no stake in the installation, so its readings are not shaped by who has to fix a problem. For the owner, that means test data they can sign against with confidence.
Skud Technical provides independent Commissioning Management and NEBB-certified Testing, Adjusting & Balancing for ACMV systems. We do not install the systems we test, and every reading comes from calibrated instruments.
What goes into a testing and commissioning report?
The T&C report is the handover record. A complete one includes:
- Commissioning plan: the scope, the tests to be carried out and the acceptance criteria.
- Pre-functional checklists: signed installation and start-up checks for each item of equipment.
- Functional test results: each system’s measured performance against design, mode by mode.
- TAB data: design and measured airflow and water flow at every terminal, coil and pump.
- Calibration certificates: for every instrument used, so each reading can be traced.
- Deficiency log: every issue found, the action taken and the evidence that it was closed.
- Final summary: a clear statement of what passed, with sign-off from the parties involved.
If you need to review the airflow section, our guide on how to read an air balancing report walks through it column by column.
T&C, TAB and commissioning: how they fit together
The three terms are often used as if they mean the same thing. They overlap, but each has its own job.
| Term | What it does | Output |
|---|---|---|
| Testing and commissioning (T&C) | Proves all installed systems work before handover | T&C report and handover pack |
| Testing, Adjusting & Balancing (TAB) | Measures and adjusts airflow and water flow to design | Certified TAB report |
| Commissioning management | Plans, witnesses and documents the whole T&C process | Commissioning plan, test records, final report |
In short, TAB produces the measured data, T&C uses it to prove each system, and commissioning management makes sure the whole process is complete and documented. Our article on commissioning vs TAB goes into the difference in more detail.
Testing and commissioning, answered plainly
What does T&C mean in construction?
When does testing and commissioning start?
Who witnesses T&C?
Is TAB part of testing and commissioning?
How long does T&C take?
Need testing and commissioning verified independently?
Skud Technical provides NEBB-certified Testing, Adjusting & Balancing and Commissioning Management for ACMV systems across Malaysia, including Sabah and Sarawak, as well as Singapore and the wider Asia region. Send us your scope and we will return a fixed proposal within 24 hours.