Testing, Adjusting & Balancing
Air and hydronic systems verified against design intent, documented to NEBB procedural standards.
- Air-side balancing
- Water-side balancing
- Pressurisation & specialised
Independent testing, certification, and commissioning for critical environments. Tell us what you are trying to do, and the finder points you to the right line and the right standard.
Malaysia's first firm certified by NEBB, the National Environmental Balancing Bureau, in both Testing, Adjusting & Balancing and Cleanroom Performance Testing.
Two NEBB-certified disciplines, plus the containment, commissioning, and specialised testing critical projects depend on.
Air and hydronic systems verified against design intent, documented to NEBB procedural standards.
Classification and certification to ISO 14644 across as-built, at-rest, and operational states.
Independent mechanical commissioning. We run and witness the process and verify the result. We are not the Commissioning Authority.
Containment and equipment performance, certified to the right standard.
Airborne particle counts and cleanliness classification for data centre white space, to ISO 14644.
Non-standard and project-specific testing, scoped to your requirement and the right standard.
The fast way to see how the six differ: the standard each is held or worked to, what you receive, and where it sits in the programme.
| Service | Standard | You receive | When it runs |
|---|---|---|---|
| Testing, Adjusting & Balancing | NEBB-certified | Certified TAB report, as-found and as-left readings | Systems energised, before handover |
| Cleanroom Performance Testing | NEBB-certified | ISO 14644 classification certificate | Cleanroom built, per occupancy state |
| Commissioning Management (CxM) | Aligned to CIBSE / ASHRAE | Commissioning records and FPT results | Through construction to handover |
| Equipment & Cabinet Certification | NSF/ANSI 49 | Cabinet and equipment certificates | On install, and as the specification requires |
| Data Centre Particle Count | ISO 14644 | Particle count and classification report | White space ready, pre-handover |
| Specialised Testing & Verification | To the right standard | Scoped verification report | As the project requires |
The correct service depends on what must be verified.
Testing, Adjusting & Balancing (TAB) is for measuring and balancing HVAC air and hydronic systems. Cleanroom Performance Testing (CPT) is for classifying and qualifying controlled environments. Commissioning Management coordinates system testing and verification through to handover. Equipment and Cabinet Certification covers units such as biosafety cabinets, fume hoods and laminar airflow equipment. Data Centre Particle Counting verifies airborne cleanliness in white-space environments.
For unusual or project-specific requirements, Skud can develop a specialised testing and verification scope.
Yes. Where the project programme and site readiness allow, Skud can combine related services within one coordinated mobilisation.
Common combinations include TAB with Commissioning Management, TAB with Cleanroom Performance Testing, and cleanroom testing with equipment and cabinet certification. Combining compatible scopes can reduce repeated mobilisation, improve coordination and give the project team a more complete record of system and environmental performance.
Send us the full project scope, drawings and required completion dates, and we will recommend the most efficient approach.
Cleanroom Performance Testing verifies the performance of the room or controlled environment against the agreed requirements. This may include particle classification, HEPA-filter integrity, airflow, room pressure, recovery and other specified tests.
Equipment located within the cleanroom may require separate testing and certification. Biosafety cabinets, fume hoods, laminar airflow units and other containment or clean-air equipment each have their own performance requirements and acceptance criteria.
Where both the room and its equipment require verification, Skud can coordinate the scopes within one testing programme.
Skud should be appointed early enough to review the testing scope, applicable standards, acceptance criteria, method statements and project programme before final testing begins.
The actual testing date will depend on the service. TAB requires the relevant HVAC systems to be installed, energised and operational. Cleanroom testing requires the room to be ready in the specified occupancy state. Commissioning Management should begin much earlier so that testing, documentation and outstanding issues can be coordinated before handover.
Early engagement gives the project team enough time to correct deficiencies and complete retesting without delaying completion.
Send us the technical objective, project specification and required acceptance criteria.
Skud can review non-standard requirements and develop a project-specific testing or verification scope, including the proposed method, instruments, reference standards, test locations and reporting format. This is suitable for unusual systems, one-off performance investigations and requirements that do not fall neatly within a standard testing package.
A Skud engineer will point you to the right line and the right standard, no obligation.