Testing, Adjusting & Balancing that proves every system performs to design.

Independent, third-party Testing, Adjusting & Balancing for HVAC air and water systems. Measured, adjusted, and certified to documented tolerances, so your project reaches handover without rework or dispute. Air balancing, water balancing and ACMV T&C, delivered by one certified team and signed off in one report.

Certified to NEBB, the National Environmental Balancing Bureau, whose international standard defines how balancing is measured and proven. The first firm in Malaysia certified by NEBB in both Testing, Adjusting & Balancing and Cleanroom Performance Testing.

Balance readoutNEBB TAB ▸ SKUD
System
Supply air · design 4,800 L/s
4,710 L/s
−10%Within tolerance+10%
Result vs design98% of designBalanced
Balancing tolerance±10%NEBB
Reading4,710 / 4,800 L/sPass
Worked to ▸ NEBB Procedural Standard for TAB ▸ ASHRAE 111 ▸ SMACNA ▸ CIBSE Commissioning Codes
The service

What TAB actually verifies.

TAB is the systematic process of measuring, adjusting, and documenting that every air and water system delivers its designed flow, pressure, and temperature, within a specified tolerance.

An installed system is not a proven system. Ductwork can be sealed and pumps can be running, yet half the zones still starve while others over-supply. TAB is the step that turns "it is built" into "it performs, and here is the data."

Because Skud does not install the systems we test, our readings carry no conflict of interest. The numbers in a Skud TAB report are the numbers a consultant, authority, or owner can sign against.

Test

Measure as-found performance against design intent, with calibrated, certified instruments.

Adjust

Set dampers, valves, and drives so each flow lands inside its acceptance tolerance.

Balance

Proportion the whole system so every zone holds its share, at the same time, under real operating conditions.

Scope of work

Air-side, water-side, and pressurisation, balanced as one system.

HVAC performance is decided where air and water meet the space. We cover the full chain, not just the easy measurements.

Air systems

Air balancing (air-side)

  • Supply, return & exhaust airflow
  • Diffuser, grille & terminal balancing
  • VAV / CAV box verification
  • Fan performance & drive setting
  • Outside-air & economiser proportioning
Water systems

Water-side balancing

  • Chilled & condenser water flow
  • Hot water & heating circuits
  • Pump performance & head
  • Coil & terminal unit flow
  • Balancing valve setting & proof
Pressurisation

Pressurisation & specialised

  • Building & zone pressurisation
  • Stairwell & lift-lobby pressurisation
  • Fume hood & exhaust face velocity
  • Smoke-control airflow verification
  • Energy & sustainability flow checks
Standards & references ▸ NEBB Procedural Standard for TAB ▸ ASHRAE 111 ▸ SMACNA HVAC TAB ▸ CIBSE Commissioning Code A & W
Air balancing

Air balancing, measured terminal by terminal.

Most comfort and pressure complaints start on the air side. Dampers are left at factory settings, fans run off their curve, and leaky ductwork loses air before it reaches the room.

We measure airflow at every diffuser, grille and fan, then adjust until each space receives its design volume within tolerance. Duct air leakage testing (DALT) and room pressurisation sit in the same scope, so the whole air side is proven end to end. Our teams work from Kuala Lumpur, Johor Bahru and Penang, and deliver projects across Sabah, Sarawak, Singapore and the wider Asia region.

On the water side, we balance chilled and condenser water at coils, pumps and chillers, so plant and air systems are signed off together.

How it runs

A documented method, from instrument calibration to certified report.

Every TAB engagement follows the same disciplined sequence, so the data is traceable and the report stands up to scrutiny.

Plan & calibrate

Review design drawings and specifications, agree acceptance tolerances, and calibrate every instrument with traceable certificates before a single reading is taken.

Measure as-found

Systematic measurement across every system and terminal, recorded against design so deviations are visible, not averaged away.

Adjust & balance

Set drives, dampers, and valves, then proportion the system so every zone holds tolerance together under real operating load.

Verify & certify

Final verification readings, deficiency close-out, and a NEBB-format certified TAB report ready for consultant and authority sign-off.

Deliverables

What you receive at handover.

A TAB report is only as good as its evidence. Ours is built to be read, audited, and signed.

Certified TAB report

NEBB-format report issued with a signed certification statement, ready to submit for consultant and authority acceptance.

As-found and as-left readings

Complete readings for every system, terminal, and circuit, so the full adjustment is documented, never averaged away.

Calibration certificates

A traceable calibration certificate behind every instrument, so every figure in the report can be independently verified.

Deficiency log

Every open item listed with a clear corrective action, so nothing stays ambiguous at handover.

Marked-up drawings

Schematics and drawings marked up with the final balanced settings, recording the system exactly as left.

Handover date set?

Send us the scope and get an independent TAB proposal.

Why independent TAB

Independence is what makes the number worth having.

An independent report gives every stakeholder one defensible source of truth, so acceptance rests on the data rather than on whose data it is.

01 / Independence

No conflict of interest

We do not install, supply, or commission the systems we measure. Our readings answer to the data, not to a programme deadline or a supplier relationship.

02 / Traceability

Defensible data

Calibrated instruments and a documented method mean every figure can be traced and holds up in a tender, an audit, or a dispute.

03 / Acceptance

Built for sign-off

Reports formatted for consultant and authority acceptance, so handover is not held up by questions the document already answers.

Built for everyone who signs

One certified report, three parties it protects.

Independent TAB is not a judgement on the installer. It is the proof that closes the job out cleanly for everyone at the table.

For the contractor

A clean, accepted handover

Independent verification closes out your mechanical handover with a report consultants and authorities accept, so you are not stuck re-proving the system or carrying a dispute after completion.

For the consultant

Data you can sign against

Third-party readings, calibrated and traceable, formatted for acceptance. Certify with confidence, because every figure stands up to scrutiny.

For the owner

Proof the system performs

Independent verification that the system you paid for delivers its design intent, documented before you accept the building.

Independently certified

Certified by NEBB, the standard TAB is measured against.

The National Environmental Balancing Bureau sets the international procedural standard for Testing, Adjusting & Balancing. It is the credential specifiers ask for by name on critical projects, and Skud was the first firm in Malaysia to earn it.

Issuing bodyNational Environmental Balancing Bureau (NEBB)
DisciplineTesting, Adjusting & Balancing (TAB)
StandingFirst firm in Malaysia certified by NEBB for Testing, Adjusting & Balancing
Firm cert no.3921
NEBB Certified Firm certificate issued to Skud Technical Sdn Bhd for Testing, Adjusting and Balancing
Where TAB matters most

Buildings where airflow is not negotiable.

Data centres
Hospitals & healthcare
Semiconductor fabs
Pharma & life science
Commercial & high-rise
Industrial & process
Common questions

TAB, answered plainly.

What is the difference between TAB and commissioning?

Commissioning is the broader quality process used to verify that building systems operate together as intended, including controls, sequences, alarms and system integration.

Testing, Adjusting & Balancing is the specialist process of measuring and adjusting HVAC air and hydronic systems to achieve the required design performance. TAB produces the verified system data that supports commissioning, acceptance and handover, but the two services have different scopes and deliverables.

The contractor has already balanced the system. Is independent TAB still required?

Contractor balancing is normally part of installation and system preparation. Independent TAB provides the consultant, owner and project team with a separate and traceable set of performance measurements.

Skud verifies the system against the approved design, project specifications and agreed acceptance criteria using calibrated instruments and documented procedures. Independent TAB is particularly important where third-party verification or NEBB-certified reporting is required.

When should TAB be carried out?

Skud should be appointed early enough to review the drawings, design values, specifications, acceptance tolerances and testing programme before site measurements begin.

Physical TAB should start when the relevant systems are complete, clean and energised, with controls functioning and dampers, valves and measurement points accessible. The programme should also allow sufficient time for corrective work and retesting before final handover.

What happens if the system cannot achieve its design performance?

Skud records the affected system, required design value, measured result and observed limitation in the TAB report or deficiency log.

The project team can then investigate potential causes such as installation restrictions, control limitations, incorrect system configuration, equipment performance or insufficient system capacity. After corrective work is completed, Skud can retest the affected systems and document the final performance.

Why does NEBB certification matter on international projects?

NEBB certification provides a recognised framework for TAB procedures, firm quality systems, qualified personnel, calibrated instruments and technical reporting.

For international and mission-critical projects, this gives consultants, contractors and owners a consistent basis for evaluating HVAC system performance across different countries and project teams. Skud is a NEBB-certified firm for both Testing, Adjusting & Balancing and Cleanroom Performance Testing, allowing us to support projects that require coordinated verification of HVAC systems and controlled environments.

What is air balancing?

Air balancing is the air-side part of Testing, Adjusting & Balancing. Airflow is measured at every diffuser, grille and fan, then dampers and fan speeds are adjusted until each space receives its design airflow. The results are recorded in a certified report.

Is Testing, Adjusting & Balancing part of ACMV T&C?

Yes. ACMV testing and commissioning proves the air-conditioning and ventilation systems work as designed. Testing, Adjusting & Balancing is its measured core: the airflow and water flow readings that show each system is within tolerance. For full ACMV commissioning, see Commissioning Management.

What does an air balancing report include?

Design and measured airflow for every terminal, as-found and as-left readings, fan and pump data, calibration certificates for every instrument used, and a deficiency log. Our guide on how to read an air balancing report walks through each section.

Get a proposal

Get the TAB report that closes out handover.

Independent NEBB-certified balancing of air and water systems, measured to agreed tolerances and documented for consultant and authority sign-off. Send the drawings or the equipment schedule.

  • NEBB-format report, built for consultant sign-off
  • Tolerances agreed in writing before we mobilise
  • Deficiencies logged with clear actions, not left open